Standards. All GE panelboards meet the latest revision of the following standards . —National Electrical Code-Ref. Article —UL67 panelboards: UL BuyLog® Catalog. Molded Case Circuit Breakers. Rev. 9/ Prices and data subject to change without notice. Section 3. Industrial Circuit Breakers. GE Fastrac Program Service. —Fastrac A-Series® Panelboards: Fastrac shipment of A-Series® Panelboards A – A is available for select main and .

Author: Arashijin Vudonos
Country: Cape Verde
Language: English (Spanish)
Genre: Technology
Published (Last): 4 June 2014
Pages: 396
PDF File Size: 9.80 Mb
ePub File Size: 13.95 Mb
ISBN: 498-9-98326-609-5
Downloads: 62882
Price: Free* [*Free Regsitration Required]
Uploader: Tojakazahn

You can also visit the publications library to get quick and easy access to thousands of GE product and marketing brochures or order a hard copy of a brochure. Later models may or may not use A phase sensors. Order from pages or General Vuylog Control Mfg: Just slide them into place. Key Interlock Provisions The key interlock provision enables the user to mount a one- to four-cylinder, narrowfaced, Kirk-type FN or Superior customer-supplied lock on the face of the switch.

GE Aftermarket Catalog

Test Button — simulates an actual ground fault and will trip switch off unless “No Trip” button is depressed prior to pushing test button. Each lug kit includes lugs, straps and hardware for threephase line or load connections. Ground fault indicator will protrude when system is tested or when actual ground fault occurs.

Kits consist of lugs and hardware for direct mounting to switch terminal straps multiple-hole tang lugs or lugs for mounting to ampere terminal adapter kit. They are suitable for use with Type STDA flange handles and variable buy,og operating mechanisms on page These switches are percent bujlog and can interrupt, on a make and break basis, a minimum of 12 times their nameplate rating without fuse assistance at Vac.

  GOETIA LUCIFERIAN EDITION PDF

GE BuyLog — Section 9: Disconnect Switches and Operating

An undervoltage release trip operation is produced by the GTU control unit in response to a signal from the undervoltage release module. GE Fastrac Program is one of the broadest, fastest quick-ship programs in the marketplace.

For dimensions of neutral current sensor to be used with integral ground fault switches, page Buylog Components and Equipment Mfg: Fuses not included NOTE: The bell alarm switch operates identically to the standard bell alarm module, except that the mechanical pop-out target must be manually reset before the switch can be closed.

All switches are prewired to dedicated secondary terminals for easy field installation. To terminate line and load cables, must be used in conjunction with bus-connection adapter on page T Studs. The key interlock extends a lever through the padlock hasp when the key is turned to the key removal or bolt extended position. Integral ground fault tripping is accomplished by a low-energy, flux-shifting tripping mechanism and is not suitable for remote paralleled tripping.

Includes fusemounting hardware and door-catch interlock bracket. Use to mount main or branch Clrcuil breakers into panelboard. No Trip Test Button — permits ground fault system check without tripping switch.

Ampere Rating Outline Drawing Approx. This allows the control unit to record, display, distinguish and communicate that the opening event was initiated by the shunt trip device.

  DAVID LANZ A WHITER SHADE OF PALE PDF

Interlocking design requires use of screwdriver to release. Rod length is 22 inches and may be cut to appropriate length. GEPQ pages Our new format in this latest edition allows for maximum convenience and access to the information you need to serve your customers.

Three required for line or buylpg connections on three-phase bus. And, for added security, a standard padlock device lets you Quick, Error-Free Installation of Universal Accessories prevent accidental or unauthorized closing of the switch. Current rating of the single SPDT switch is identical to the auxiliary switch accessories.

Their installation simply involves removal of switch cover, installation of the switch module, routing of wiring and installation of the pre-wired terminal block and re-installation of the cover.

Order three kits for three-pole line or load end. Class H Fuse Clips are standard. Minimum Enclosure Size – Height in.

Mechanical Indicator — protrudes when ground fault occurs.

GE BuyLog — Section 9: Disconnect Switches and Operating

One kit required per switch. GEPC pages The various indexes included in this catalog are designed to enable the user to locate the required information as quickly and conveniently as possible. Accepts Anderson VersaCrimp when lugs are removed from straps. Documents Flashcards Grammar checker.